Ferrier Field in the Central Alberta Area (2008 to present)

Ferrier Field in the Central Alberta

Approximately 50 Well Pads and Associated Pipelines (89mm Outside Diameter – 273mm OD)

  • Sweet natural gas wells producing natural gas, condensate and water.
  • Wellsite equipment consists of production heaters, dry measurement skids, chemical storage, utilities and pipeline riser.
  • Number of wells drilled per pad ranges from one to four generally, with a few in excess of four.
  • A high level of standardization and ability to relocate equipment no longer required from other well pads was the major cost driver for the success of these projects.