Ferrier Central Processing Facility Pipeline Infrastructure (2012 to Present)

Ferrier Central Processing Facility Pipeline Infrastructure

Approximately 175km of Pipelines in Single and Common Trench (168mm Outside Diameter to 324mm OD)

  • All pipelines to be constructed from CSA Gr 359 and 386 material, with the exception of a composite Flexsteel water transfer pipeline.
  • Pipeline external coating materials range from YJ-1 to FBE products, depending on service temperature, ground conditions and pipeline construction method.
  • All of the pipelines are either outfitted with pigging facilities or have provision for pigging facilities, depending on the service.
  • Challenges with these projects include ground conditions (muskeg), shortened construction season in certain areas, environmental concerns, installation of pipelines and risers into operational facilities. Many of the pipelines are installed in common trench with upwards of six pipelines in one trench.