Kakwa and Red Rock Fields Equipment Modularization (2012-2013)

Kakwa and Red Rock Fields Equipment Modularization
  • With a growing need to decrease field costs, Precision looked at options to modularize equipment, prefabricate portions of the outside piping, and minimize field installation costs.
  • Several options were considered including modularizing the line heater and meter skids while still maintaining the ability to remove and relocate the heater to another site when no longer required as part of the process and unitizing the inlet and outlet piping of the meter skids into prefabricated components ready for installation on site. This included the inlet control valve, inline flow testing connections, PSV’s and associated support structure, and outlet piping including the meter prover connections.